Mark selected PDF pages with a print proof badge
Admin ·
Mark the page your printer or reviewer should inspect. Give the proof a revision or job reference and include the original page number so its place in the document stays clear.
Stamp the rotated postcard page
Select Load example. Keep the Proof label PRINT PROOF, the revision line Revision B and Include original page number. Enter 2 in Pages to stamp.
Keep Top right and Outline. Prepare the proof PDF, select Compare original and result, then set Preview page to 2. The badge contains PRINT PROOF, Revision B and Page 2 of 2. Its position follows the visible edges of the rotated page.
Download the two-page Harbor Postcard PDFAdobe PDF reference for page boxes, rotation and page content
Check the unmarked page and move the badge
Set Preview page to 1. Its picture and text are unchanged because it is outside the selected range. Keep the range at 2 while you change Proof position to Bottom left and Proof style to Filled.
Prepare again and compare page 2. The badge moves to the lower-left edge. The filled style places white text on a solid color. Use the preview to find a clear part of the page before exporting.
Download the two-page Harbor Postcard PDFAdobe PDF reference for page boxes, rotation and page content
Verify the saved proof and its page boxes
Download pdf-press-postcard-proof.pdf and reopen it. Search for Revision B and confirm it appears on page 2. The original text is still searchable. Check page 1 for the unmarked postcard and look at the document's page boxes if you are sending it for print.
The badge uses the existing visible page. If the proof overlaps important details, change its position, size or inset and prepare the copy again.
Download the two-page Harbor Postcard PDFAdobe PDF reference for page boxes, rotation and page content
Common questions
Does Page 2 of 2 mean I stamped both pages?
It describes the page's original position in the document. The result separately reports how many pages received a badge.
Which line can carry a job number or date?
Enter it in Revision or job line. The second line uses a smaller font and stays with the proof label.